Fresh concrete must cure for 28 days before installation. 2. Space and Clearance
Ensure at least 4 meters of overhead clearance. Bay Width: Leave 1 meter of space around the lift posts. stenhoj ds2 manual
Avoid placing the lift over expansion joints or cracks. Step-by-Step Installation Fresh concrete must cure for 28 days before installation
Proper site preparation ensures the safety and longevity of your lift. 1. Floor Requirements Reinforced concrete only. Thickness: Minimum 150 mm to 200 mm depth. Strength: Concrete must handle at least 3000 psi. Bay Width: Leave 1 meter of space around the lift posts
Note: Professional installation is highly recommended to validate warranties. Step 1: Unpacking and Layout
If your model has an overhead bridge, install it now.Run the synchronization cables or chains through the crossbeam.Ensure equal tension to prevent the arms from lifting unevenly. Step 5: Electrical Connection