Note: Changes to DIP switches usually require a power cycle to take effect. 5. Initial Power-Up and Testing Once wiring is complete and the workspace is clear: Apply power to the system. LED Diagnostics: Watch the front panel LEDs. Power LED: Should be solid green.
Use a small tool to toggle the switches to the "On" or "Off" positions required for your specific network architecture. juq405 install
Angle the top hook of the JUQ405 onto the top of the DIN rail. Note: Changes to DIP switches usually require a
The JUQ405 features pluggable terminal blocks for easier maintenance. LED Diagnostics: Watch the front panel LEDs
Ensure the main power supply to the cabinet is turned off and locked out according to your facility’s safety protocols.
Small flat-head screwdriver (for terminal blocks), wire strippers, and a DIN rail cutter (if the rail isn't pre-mounted).