Aqmos R2d272 Installation | Verified

: Secure the wastewater hose to the system's drain port with a hose clamp and lead it to your drain system.

: Fill the cabinet with up to 50 kg of high-purity salt tablets (NaCl). 3. System Programming and Commissioning aqmos r2d272 installation verified

: Attach the stainless steel hoses to the bypass. Ensure flat seals are correctly placed in the connections. : Secure the wastewater hose to the system's

: Install the bypass valve on the back of the control head, securing it with the provided clips and screws. aqmos r2d272 installation verified